Horizontal displacement achieved on EP21-4-A1H — China's first ultra-deep extended-reach well, completed 2024. FECCS kept circulation uninterrupted through every pipe connection, stabilizing ECD and enabling what conventional drilling could not. EP21-4-A1H井水平位移,2024年完成的中国首口超深大位移井。FECCS在每次接单根时保持钻井液不间断循环,稳定ECD,实现了常规钻井无法达成的目标。
When connecting a new drill pipe stand — typically a 2–5 minute dead stop — conventional drilling halts mud circulation. This pressure fluctuation can cause wellbore instability, lost circulation, or influx in narrow pressure-window formations. 在接单根过程中(通常需要2至5分钟),常规钻井必须停止钻井液循环,这种压力波动可能在窄压力窗口地层中引发井壁失稳、漏失或溢流。
FECCS eliminates this dead stop entirely. Our valve-type continuous circulation joint maintains full mud flow through every connection — keeping ECD stable within 0.036 g/cm³ fluctuation across the entire drilling program. FECCS彻底消除了这一停泵间隔。我们的阀式连续循环接头在每次接单根过程中保持全量钻井液流动,使整个钻井程序的ECD波动控制在0.036 g/cm³以内。
| Main Unit Pressure主机额定压力 | 70 MPa |
| High-Pressure Hose高压软管压力 | 52 MPa |
| 7" Circulation Joint — Rated Pressure7寸循环接头额定压力 | 75 MPa |
| 7" Joint — Tensile Strength7寸接头抗拉强度 | ≥ 500 T |
| Max Downhole Duration最长井下服务时间 | 240 hours |
| Rubber Material橡胶材料 | HNBR |
| Temperature Rating温度额定值 | −45°C to 150°C |
| System Classification系统类型 | Valve-type (China's first field-verified system)阀式(中国首套现场验证系统) |
9,508m horizontal displacement. FECCS provided uninterrupted circulation throughout the entire extended-reach section, enabling drilling performance that exceeded design by 49 hours ahead of schedule. 水平位移9,508米。FECCS为整个大位移段提供不间断循环,实现了比设计提前49小时完成的钻井作业。