A high-calibre team of petroleum engineering professionals with extensive onshore and offshore experience across domestic and international oil and gas fields. Deeply familiar with both offshore and onshore field management and operations — integrating drilling & completion, well design, and project preparation into a single professional workforce. 由具有国内外陆地、海上油气田工作经验的石油工程技术人员组成的高素质团队。熟悉海洋石油、陆地油田的管理与运作模式 — 集钻完井、钻井设计、项目筹备为一体的专业队伍。
Drilling & Completion Supervision钻完井现场监督
On-site supervision of drilling and completion operations across exploration and development wells.勘探与开发井钻井及完井作业的驻井监督。
Well Design & Engineering井设计与工程咨询
Well architecture design, drilling programme review, and engineering technical support.井身结构设计、钻井方案审核及工程技术支持。
Project Preparation & Mobilisation项目筹备与调配
Pre-spud project mobilisation, equipment readiness, and contractor coordination support.开钻前项目调配、设备就绪检查与承包商协调支持。
Project Planning & Design项目立项与设计
Engaged from the planning phase — well objective definition, geological correlation, well architecture sizing, drilling programme drafting, and risk assessment. Our team works alongside the operator's planning group to ensure the design reflects field operational realities.从立项阶段介入 — 井目标定义、地质对比、井身结构设计、钻井方案编制、风险评估。团队与作业方策划小组协同,确保设计符合现场作业实际。
Pre-spud Preparation开钻前筹备
Equipment readiness audit, contractor mobilisation co-ordination, BOP/wellhead readiness checks, materials inventory verification, HSE pre-job briefings, and spud meeting facilitation. Catching pre-spud issues prevents costly downtime later.设备就绪审核、承包商调配协调、BOP/井口就绪检查、物料库存核对、HSE 开工前培训、开钻会议组织。提前发现开钻前问题,避免后期高成本停工。
On-site Drilling Supervision钻井作业现场监督
24/7 wellsite supervision with daily/weekly operations reports, vendor performance tracking, AFE cost control, safety incident handling, and real-time technical decision support. Our supervisors act as the operator's eyes and ears on the rig.7×24 驻井监督,日报/周报、服务商表现跟踪、AFE 成本管控、安全事件处置、实时技术决策支持。监督代表作业方在钻井现场履行监管职责。
Completion & Testing完井与测试
Completion programme oversight, downhole equipment run/recovery supervision, well stimulation and clean-up monitoring, DST test supervision, and final well configuration verification before hand-over.完井方案监督、井下设备下入/回收监督、井解堵与清井监督、DST 测试监督、交井前最终井况确认。
Hand-over & Post-Project Review交井与项目后评估
Final well documentation, hand-over to production, lessons-learnt session with the operator's team, and post-project performance review feeding into the next project's design — closing the continuous improvement loop.最终井档文件、向生产交接、与作业方团队的经验教训总结会议、项目后评估反馈到下个项目的设计 — 持续改进闭环。
Contact our team to discuss personnel configuration, role specifications, and on-site mobilisation for your drilling or completion project. 联系团队,沟通钻井或完井项目的人员配置、角色定义与现场调配。